Jadhav, UmeshKhan, Muhammad (12CE32)Khokar, Abdul (12CE39)Khan, Mubashir (12CE42)2016-10-012016-10-012016-05http://www.aiktcdspace.org:8080/jspui/handle/123456789/1807Keywords: Planning, Scheduling, High Rise Buildings, Primavera, Critical Path, Gantt Charts,With the onset of High Rise Buildings in metropolitan cities, planning and scheduling has become a major concept to be considered for a smooth execution of construction works. Oracle’s Primavera P6 is an effective tool for determining an ideal schedule for construction activities. This project serves as a perfect reference frame for scheduling different High Rise Buildings. All the important steps like creating an EPS, creating a WBS, linking of activities according to their interdependence and availability of resources, reduction of float values, and determination of Critical Path are clearly exhibited in this report.en-USProject Report - CEPlanning and scheduling of a high rise building using primaveraProject Report