Gawade, Prathamesh P.Shaikh, Saquib I (14DCES73)Baqi, Tabish U (13CES60)Shaikh, Abdul Ahad (15DCES82)Sayed, Fahad(13CES45)2018-08-212018-08-212018-05http://www.aiktcdspace.org:8080/jspui/handle/123456789/2631Submitted in partial fulfilment of the requirements for the degree of Bachelor of Civil EngineeringThe following project deals with the planning, analysis, designing, quantity and cost estimation and scheduling of a 4-storey Hostel building using advance Civil Engineering softwares like AutoCAD, ETABS, Primavera P17 and Microsoft Excel Spreadsheet. Project starts with planning of the building using AutoCAD. Then analysis of building is carried out using ETABS and Microsoft Excel Spreadsheet. Also detailing of reinforcement is done in ETABS. Then for quantity and cost estimation Microsoft Excel Spreadsheet. Further scheduling and monitoring was done on the software Primavera P17.enProject Report - CEPlanning, designing, estimation and scheduling of AIKTC hostel buildingProject Report