Repository logo
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    Have you forgotten your password?
Repository logo
  • Communities & Collections
  • All of DSpace
  • English
  • Català
  • Čeština
  • Deutsch
  • Español
  • Français
  • Gàidhlig
  • Italiano
  • Latviešu
  • Magyar
  • Nederlands
  • Polski
  • Português
  • Português do Brasil
  • Suomi
  • Svenska
  • Türkçe
  • Tiếng Việt
  • Қазақ
  • বাংলা
  • हिंदी
  • Ελληνικά
  • Yкраї́нська
  • Log In
    Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Shaikh, Imran (13CES50)"

Now showing 1 - 1 of 1
Results Per Page
Sort Options
  • Loading...
    Thumbnail Image
    Item
    Planning and scheduling of ROB project : A case study Mumbra ROB
    (AIKTC, 2017-04) Jadhav, Umesh; Khan, Mohd. Saif (13CES23); Sayyad, Maaz (13CES46); Shaikh, Imran (13CES50); Choudhary, Azim (13CES15)
    This study deals with the scheduling of ROB project which is under construction. Due to increase in number of passengers from Mumbra, the Mumbai Railway Vikas Corporation Ltd is constructing two new railway lines to decrease the passenger traffic. Hence for this road over bridge is being constructed at the proposed site. The ROB construction started in August 2013 and has not been completed yet due to various delays. However it was estimated that the project will be completed in 18 months. The original project was scheduled using traditional methods of construction management. This study is scheduled using the project management software “PRIMAVERA”. Primavera is an appropriate technology for managing construction projects and can improve the construction planning and design efficiency by integrating locations and thematic information in a single environment. In this study the various activities were linked together and their duration was assigned, the software scheduled the activities and thereby estimated the duration of the project accordingly. According to the scheduling done by the software the project duration comes out to be less than the original estimated duration of the project which was 18 months.

DSpace software copyright © 2002-2025 LYRASIS

  • Cookie settings
  • Privacy policy
  • End User Agreement
  • Send Feedback